



108 fotografías
Localizado
Lebanon, TN
Lebanon, TN
Uso
223,844 mi
223,844 mi
Número de serie
2FZHAZAN13AK12075
2FZHAZAN13AK12075
Loading...
IronClad Assurance se encarga de proteger este lote
Compre con confianza, consciente de que un inspector calificado inspeccionó por completo este lote.
Número de identificación
#15121377
En el patio
Sí
Características
Cat C10 6 Cylinder 10.3 L Diesel Engine, 2002 US EPA Label, 1572 Engine hrs, Air Conditioner, Cruise Control, Engine Brake, Eaton Fuller FRO-13210C 10-Speed Manual Transmission, 18000 lb Front Axle, 46000 lb Rears, 64000 lb GVWR, Aluminum Outer Wheels, 385/65R22.5 Front Tires, 10R22.5 Rear Tires, Dual Steering Boxes, Double Frame, Spring over Walking Beam Suspension, 250 in Wheelbase, PTO, Steel Debris Tank, Hoist, Vibrator, Fresh Water Tank, Hydraulic Lift Tailgate, Hydraulic Tailgate Locks, 13 ft Boom, 8 in Suction Hose, PTO Driven Pump, Blower w/ 3306 hrs, Remote Control w/Cord, Hi-Rail System
















Imagen: esquina delantera izquierda
Imagen: esquina trasera izquierda
Imagen: esquina trasera derecha
Imagen: esquina delantera derecha
N.º de serie/VIN
2FZHAZAN13AK12075
Frame Stamp Serial Number/VIN Photo
Horímetro / Odómetro
223844 mi-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Normas Federales de Vehículos Automotores
Yes
Pintura
Condición de la chapa metálica (fibra de vidrio)
Escalones/escaleras
Pasamanos
Vidrio de Cabina
Funcionamiento de las luces exteriores
Operational
Steer Axle
Rear Axle
Rear Axle













Emissions Status
2002 US EPA Label
Emission Label
A/C Compressor
Compressor will not engage
Blow-by (subjective visual observation)
No noticeable vapor or pressure
Motor de arranque
Operational
Air Compressor
Operational
Bomba de inyección
Operational
Exhaust System
Radiador
Oil Leaks
Side of engine
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
Limited Function Check
The engine started and ran.

















Engine Hours
1572 Engine hrs
Espejos
Control de Ventanas
Both Manual
Asientos/apoyabrazos
Cinturones de seguridad
Operational
Controles de la dirección
Horn
Air horn operational, Electric horn operational
Presión de aceite
The gauge registers in the operating range.
Luces de advertencia del motor
Operational
Calibradores
Operational
Gear Selector
Excessive movement, hits dog house cover
Control de Frenos
Operational
Freno del motor
Not operationally checked
Embrague
Engages
Control de PTO
Air engaged, Operational
Millas ECM
Unable to get ECM reading
Aire acondicionado
Inoperable
Calefactor
Operational
Revisión del funcionamiento limitado (cs)
The main components are in place and operational as noted.

























Componentes de la Dirección
Eje de Dirección (no Propulsado)
Transmisión
Operational
Despegue propulsado
Operational
Bomba PTO
Operational
Condición del chasis
Eje delantero
Dripping Leak
Eje trasero
Limited Function Check
The drivetrain was operational without a load.
Resortes/Ganchos de Suspensión
Bujes de Suspensión
Left Steer Tire
Left Front Drive Tires
Left Rear Drive Tires
Right Rear Drive Tires
Right Front Drive Tires
Right Steer Tire
Condición de las ruedas
Clavos de las ruedas
Kit Húmedo Para Tuberías
Dripping leak
Tanque hidráulico
Limited Function Check - Brakes
The service brakes are operational, The park brake is operational.





































Manguera de Admisión de Bomba de Vacío
Silenciador
Bomba de Vacío
Vacuum Drive
PTO Driven
Trampa Secundaria
Primera Trampa
Debris Tank
High Lift Dump Option
Tanque de agua
Not operationally checked
Condición del pescante
Pressure Pump - Water
Control Remoto
Operational
Cajas de Herramienta/Almacenamiento
Revisión del funcionamiento limitado
The main chassis components functioned when checked without a load.
Oil Sample Analysis
| engine | |
|---|---|
| date of analysis | Jun 05, 2026 |
| Silicon | 0 PPM |
| Tin | 1.03 PPM |
| Silver | 0 PPM |
| Aluminum | 0.24 PPM |
| Chromium | 0.68 PPM |
| Lead | 1.49 PPM |
| Copper | 2.61 PPM |
| Nickel | 1.49 PPM |
| Iron | 23.12 PPM |
| Glycol | NEG |
| Water | NEG |
| Fuel | <5% |
Los artículos se deben pagar en su totalidad antes del miércoles, 8 de enero de 2031. Se aplicarán cargos por atraso después de la fecha de vencimiento.
Lleve su equipo a donde tiene que estar con el servicio completo de logística puerta a puerta y soluciones de envío de Ritchie Bros. Nos ocupamos de cada paso del viaje con nuestro servicio todo incluido para que sus equipos crucen fronteras, continentes y océanos con rapidez y eficacia
El informe detallado del equipo está limitado en su alcance y Ritchie Bros. Auctioneers no ha inspeccionado ningún aspecto o componente del equipo además de los que se especifican expresamente aquí. A menos que se diga expresamente, no efectuamos declaraciones ni otorgamos garantías, expresas o implícitas, concernientes al equipo o sus componentes, incluidas sin limitación cualesquiera declaraciones o garantías concernientes a la funcionalidad, la conformidad o el cumplimiento de cualquier estándar de seguridad o requerimiento de cualquier autoridad correspondiente u organismo normativo, adecuación para cualquier propósito en particular, o comercialización. Se le recomienda muy especialmente que realice su propia inspección detallada del equipo antes de ofertar.
Los equipos no se prueban bajo carga ni se manejan en todas las marchas disponibles. No efectuamos ninguna declaración ni otorgamos garantía alguna en cuanto a que el equipo está operando de acuerdo con las especificaciones del fabricante. No se ha realizado ninguna inspección con respecto a ningún aspecto funcional que no sean las que expresamente se incluyen aquí. Se han proporcionado fotografías seleccionadas de componentes individuales del chasis, y pueden no ser indicadoras de la condición de todo el chasis como una unidad.
Las mediciones se expresan de modo estimativo solamente. Las dimensiones reales de la carga pueden variar según la altura del camión o remolque y la posición o configuración de la máquina cargada. Es responsabilidad del comprador calcular las dimensiones de las cargas antes de abandonar nuestro sitio de subastas a fin de garantizar que aquellas se pueden transportar de modo seguro. El comprador deberá verificar todas las dimensiones. No confíe en estas dimensiones para fines de transporte.